Balink Glas & Aluminium has been part of the Xidoor Group since 2023. Located along the A32 in Heerenveen, it has a production site covering 16,000 m2: a showroom and offices at the front and no fewer than five production halls and one large logistics hall. From small shelves to meter-high specialist walls to hundreds of serial works, Balink is your partner in the field of glass & aluminum.